Shrink wrapping machine manufacturer teach you the process of installation?

Shrink wrapping machine manufacturer teach you the process of installation?

1、Every shrink wrapping machine will be with a power cable before delivery, at the end part of power lead has the identification symbols, so be sure to see clearly when connect, in cause any electric shock accidents.

2、After three months’ running , should conduct a comprehensive inspection of the tunnel circuit, and according to the aging degree for discretionary replacement

3、Because of tunnel power consume is much bigger, so input power must bigger than So the input power supply must be greater than the power of trademark indicates, so as not to burn out lines and electrical components

  1. Pay attention when shrink wrapping machine install. Installation should choose levels, also be sure the based must be stable, reliable and recheck the ground is level, otherwise it will shorten the service life of electric heating tube. For mesh belt transmission machine, its tilt installation will lead to the conveyor belt off center.

5.Shrink wrapping machine should be installed under reliable ground connection condition, to sure the personal safety.

6.Many operator easy to make a mistake is that cut the power as soon as finish the work, the correct operation is firstly close heat switch, let transport motor and fan continue to work for about 10 mins, then cut the whole power.